We recently finalized a comprehensive service at A Major Argentine Steel Company, within the Hot Rolling area, delivering one of the largest flushing and chemical cleaning projects ever executed at the plant.
Lubrication System No. 7
- 13 days execution
- 13 professionals involved
- Nearly 600 meters of carbon steel piping (10”, 8”, 6”)
- 15 critical lubrication branches
- 25,000-liter tank cleaning
- High-pressure water internal pipe cleaning
We ensured a Reynolds Number above 10,000, achieving the turbulent flow regime required for effective contaminant removal.
This was the largest flushing performed at the plant, completed on schedule.
Walking Beam Hydraulic System
Chemical and oil-hydraulic process over nearly 300 meters of 1 ¼” piping.
Operational Capability
9,000 l/min pumping capacity enabling high-flow filtration, chemical cleaning, and fuel transfer operations.
Safety
The project was executed with zero safety incidents or plant deviations, reflecting strong planning and strict HSE standards.
Proud to combine engineering, hydraulic control (Re ≥ 10,000), and teamwork to maximize reliability.